LCCC Science Lab

The new 3-story, 50,843-sf building features technical laboratory space, student classrooms and collaborative function spaces. The first floor accommodates teaching labs and instruction stations for Chemistry (6,200-SF), and Physics (4,750-SF). The second floor includes 8 teaching labs and instruction stations for biology (13,100-SF).  Each floor includes common areas and restrooms.  Site work includes plaza and asphalt parking lot and bioswayle installations for storm water management.   The project received LEED Silver certification.

In the absence of an agency construction manager, Infinity acted as the lead contractor coordinating the project’s difficult schedule with the MEP Prime contractors.  Despite over 6 weeks of material fabrications delays that Infinity expedited outside its contract, we delivered the building in time to facilitate the College’s start of classes in August of 2013.   We self-performed  rough and finish carpentry.  We made extensive use of mock-ups  to assure that instructor stations met college expectations.  We recycled more than 84% of construction waste as part of the LEED certification effort.