Projects

  • Westlake Health Center

    Westlake Health Center

    This project involved the renovation of 9,000-sf at Crocker Park in Westlake. The renovated areas include exam space for express care, primary care and specialty care disciplines. Various services at other locations were consolidated into this office. The exam rooms…

    Read more

  • University of Toledo – University Hall

    University of Toledo – University

    This general contracting assignment involved replacement of 341 windows on the top floor of University Hall including 78 "Cloverleaf" windows original to this building which was constructed in 1931. Achieved 15% EDGE participation for this very specialized project by creative teaming. …

    Read more

  • Beachwood Fire Station

    Beachwood Fire Station

    New two-story, steel bay, ground-up building. Exterior is stone, with ground face block and curtain wall. A snow melt system services the fire truck bays and all of its outside approaches. The site work includes several bio-swayles to collect storm…

    Read more

  • New York Life

    New York Life

    Infinity served as Construction Manager At-Risk on the complete interior demolition and re-construction of floors 6, 9, and 11 at 200 Public Square.  Scope included open plan offices, a large training room, control room, conferencing center and a new reception area.  Each…

    Read more

  • QIC Cleveland Offices

    QIC Cleveland Offices

    Complete build out of 18,600-sf on the 15th floor in Fifth Third Center in downtown Cleveland. High end finishes at reception area, conference, board rooms. General open office for remainder of space with pods of offices and quiet rooms around…

    Read more

  • World Shipping HQ Offices

    World Shipping HQ Offices

    This 31,500-sf project involves minor demolition on floors 1-2, nearly gut demolition on 3rd and 4th floor.  New construction includes reception area, offices, board room, conference rooms, cafe, wellness center, server room, restrooms and an outdoor patio.  mail room, cafe, conference…

    Read more

  • Warrensville PK-5 School

    Warrensville PK-5 School

    This new PK-5 school will be built after we abate and then demolish an existing vacant school building on site at 21865 Clarkwood Parkway.  The new 88,264-sf building will feature 21st Century Learning classrooms, an enlarged gymnasium.  The new facility will…

    Read more

  • MetroHealth – Behavioral Health

    MetroHealth – Behavioral Health

    This 10,485-sf micro-phased construction management at-risk project begins with selective demolition and abatement.  Subsequent renovations include modifying existing conditions including doors/hardware, toilet/lavatory fixtures/trim, ceiling grilles and diffusers and fasteners etc.  Reconfiguration creates new ante room(s) at entry to unit, reconstruction…

    Read more

  • South Pointe Hospital

    South Pointe Hospital

    This project completed in two-phases. the 5th floor is a partial renovation that involves replacement flooring, ceiling, finishes, and relocation of some walls and offices. It accommodates dialysis unit, and the Grace Hospital South Pointe rehabilitation unit. After completing the…

    Read more

  • Beachcliff – Family Health Center

    Beachcliff – Family Health Center

    This project for The Cleveland Clinic Foundation was delivered under an Integrated Project Delivery (IPD) contract.  It involved expansion and renovation to original facility Infinity constructed in 2008.  1-story steel fame with brick and EIFS exterior.  Phase I is a 4,726-sf…

    Read more

  • Palio Restaurant

    Palio Restaurant

    This Construction Management engagement includes the build-out of a 5,200-sf Tuscan grill and bakery restaurant in a new building. 1-story steel frame building. Restaurant seating, open ceilings that are 20' high, exposed ceiling deck, polished concrete floor. Scope includes restaurant…

    Read more

  • Toledo Chop House

    Toledo Chop House

    This construction management assignment at the new ProMedica headquarters is located at the Three Seagate Building on Summit Street.  This 6,700-sf first-floor restaurant features seating for 200, a full bar, full-service kitchen and administrative offices.   Premium finishes include brass mesh ceiling,…

    Read more

  • Mitchell’s – Strongsville

    Mitchell’s – Strongsville

    This new 1-story, stand-alone, 3,105-sf retail store features stylish glass and metal panels.  The space includes 3 operable double doors to create an 1,610-sf outdoor patio, features ornate interior woodwork, an aesthetically striking multi-level roof,  and porcelain tile floors.  The…

    Read more

  • Fresenius Medical Care – Cleveland

    Fresenius Medical Care – Cleveland

    Infinity  served as General Contractor for this new two-story, 32,575-sf dialysis facility, the largest operated by Fresenius Medical Care in the United States.  The facility operates 24/7 and includes a wing that allows for treatment while patient are asleep in…

    Read more

  • Parker Hannifin Downtown Cleveland YMCA

    Parker Hannifin Downtown Cleveland YMCA

    As Construction Manager At-Risk, Infinity completed interior demolition and reconstruction of a two-story retail mall space attached to the 40-story Tower at Erieview office building. This new Parker Hannifin Downtown YMCA includes a first-floor aquatics suite and three-lane pool over…

    Read more

  • Tri-C Mandel Humanities Center

    Tri-C Mandel Humanities Center

    Infinity served as General Contractor for the renovation of the existing 9,000 sf first floor and 14,000 sf second floor renovation to create unique collaboration and study spaces.  Major spaces include the entry lobby, collaboration spaces, the Simon and Rose Mandel Theater, 3…

    Read more

  • Nestle Harper Building

    Nestle Harper Building

    The Harper Building represents a 3-story, 111,000-sf  phased renovation in Solon,Ohio  that began in 2015 and continues today with a factory office project that completes in September 2018.  The building has remained substantially occupied throughout. The scope of work included selective interior…

    Read more

  • NOMS Medical Center- Clyde, OH

    NOMS Medical Center- Clyde, OH

    This Construction Manager At-Risk assignment in Clyde, Ohio involved construction a new 22,900-sf, one-story, steel-framed structure. The building enclosure is brick veneer with metal panels and a curtainwall window system. The scope includes 24-exam rooms, 2-nurses stations, 5-procedure rooms, 5-physician’s…

    Read more

  • BGSU Huntington Building

    BGSU Huntington Building

    This 34,931-sf project was a three-phased renovation of a single story existing University administration building for eight University departments including human resources and accounting groups, and the Emergency Management Command Center. The scope of work included extensive site work, building exterior…

    Read more

  • KeyBank Tower 3rd, 5th & 9th Floor Renovations

    KeyBank Tower 3rd, 5th & 9th Floor

    As Construction Manager At-Risk, Infinity performed interior demolition and  re-construction of 3-floors in Cleveland’s preeminent Class “A” office building, Key Tower.  Through multiple phases and moves we re-stacked the building while performing  cosmetic renovation to 8-additional fully occupied floors.  Those improvements…

    Read more

  • Euclid City Schools

    Euclid City Schools

    Infinity was the lead General Trades Contractor for the construction of four new elementary schools in Euclid, Ohio in total 280,000-sf. The four different school locations required individual on-site management teams as well as an oversight management team responsible for…

    Read more

  • Nordonia High School Athletic Complex

    Nordonia High School Athletic Complex

    Infinity constructed a new baseball stadium at the same location of the old football stadium that was removed during Phase 1 site improvements. Also installed, were all new site utilities, sidewalks, fencing and permeable pavement access road. This sports complex includes…

    Read more

  • MetroHealth Emergency Department

    MetroHealth Emergency Department

    This 11,900-sf, three-Phase renovation took place in the Emergency Department on the Main Campus ground floor. Scope included 5 exam rooms, 2 family rooms, 6 triage rooms, reception, waiting area, and relocation of the MetroHealth Police Department to the waiting…

    Read more

  • Britton Gallagher

    Britton Gallagher

    Infinity served as Construction Manager At-Risk for this 27,000-sf two-phase office build-out.   The scope included complete interior demolition and re-construction of the 30th floor at One Cleveland Center. A year later, we returned to complete a 7,500-sf expansion for the…

    Read more

  • Oberlin College North Athletic Complex

    Oberlin College North Athletic Complex

    Infinity performed complete demolition of the existing football stadium, grandstands, concessions, press box facility, locker rooms, restrooms and scoreboard. The new 16,900-sf field house includes locker rooms, concessions and restrooms, alumni pavilion and observation decks, and 3,000-sf conference space. Its…

    Read more

  • Cuyahoga County CBCF

    Cuyahoga County CBCF

    Infinity was the General Contractor on this 53,000-sf medium security corrections facility located just south of Cleveland’s central business district. The new construction included resident dormitories, administrative areas, food service areas, classroom and meeting space and indoor / outdoor exercise facilities. …

    Read more

  • All Pro Freight Stadium

    All Pro Freight Stadium

    Infinity was the General Contractor for this 4,000 seat state-of-the-art minor league baseball stadium in Avon, Ohio. The 330,000 s.f. field facility includes 11 executive suites, 2 open suites, box seating, lawn seating, team offices.  8,000-sf of structures include a…

    Read more

  • LCCC Science Lab

    LCCC Science Lab

    The new 3-story, 50,843-sf building features technical laboratory space, student classrooms and collaborative function spaces. The first floor accommodates teaching labs and instruction stations for Chemistry (6,200-SF), and Physics (4,750-SF). The second floor includes 8 teaching labs and instruction stations…

    Read more

  • Equity Trust Corporate Headquarters

    Equity Trust Corporate Headquarters

    This Construction Manager At-Risk project entailed complete interior demolition, design and re-construction of an existing 70,000-sf 4-story medical office building for adaptive reuse as a corporate headquarters. Reconstruction involved stripping the existing building down to its structural frame and rebuilding the…

    Read more

  • Anthony M. Pilla Student Learning Center

    Anthony M. Pilla Student Learning Center

    Infinity served as the General Contractor on this 27,350-sf two-story structural steel and load bearing masonry building. Phase I of this project was a new structural steel and load bearing masonry building.  The poor soils at the project required an augur…

    Read more