Campus Renovation

Project details

Infinity served as CMAR for two buildings on the Euclid Schools High School campus.  Fordyce is a 26,900-sf two story school administration building.  Its first floor includes a reception area, the school board room, a conference center, and staff offices.  Also, a mail room, and restrooms.  On the second floor are more offices, a conference room, vault, and restrooms.  Also, a new exterior curtain wall.  Memorial is an adaptive reuse.  The former two-story, 47,000-sf elementary school is now a student services building.  The first-floor houses mental health, social workers, counselling offices, and a food and clothing pantry.  Also, security, and detention and suspension classrooms.  Also, Thrive Academy, a teaching kitchen, and a lunch room.  The second floor provides classes for students with children, adult diploma, career-based intervention, testing classrooms, and virtual classrooms. Also, a community room.  Both floors have new restroom suites.  Both buildings received new roofs and HVAC systems. 

Our VRV heating and cooling option saved 20-30% in first and maintenance costs over traditional roof top units.  Existing drawings were not accurate which required a custom rework of HVAC duct.  We discovered unknown asbestos.  We had to re-sequence the trades to make up for that delay.  Work completed in 7.5 months, inclusive of design, and completed on time.  We achieved 36% diverse subcontracting participation.

Fordyce Administration Building
Memorial Student Services Building
Combo Picture

Category

Tags

Client

Euclid City School District

Project Completion Date

August 2022

Project Metrics

Volume Range: >$10M <$20M

Scroll to Top