Fire Department Addition and Renovations

Project details

Infinity served as CMAR.  This project involved constructing 60′ x 77′, two-story, 9,240-sf addition to the east side of the current building at 11111 Kinsman Road converting a former parking lot.  It includes six dorm rooms, two changing rooms, lockers, restrooms, a fitness center, five offices, a conference room, a reinforced storm shelter, staff kitchen and dining area, a large community/staff training room, and IT room.  The building features a relocated main entrance that separates the public from firehouse operations.   The project will complete in approximately 8-months, by the end of 2023.

Infinity worked in preconstruction for about one year before starting construction in April 2023.  Our collaborative estimating efforts with the Project Team resulted in a guaranted maximum price within the Owner’s budget.   In the first stages of construction we encountered a few hidden infrastructure issues.  One required internal reinforcement of the existing wall that separates the apparatus bay from the new addition.  A second required temporary relocation of the secondary transformer lines, which were encased underground in concrete.  This was necessary to maintain power to the existing facility.  Diverse subcontractors will put 28% of the construction volume in place.

Training Room
Turnout Gear Room
Kitchen

Newbury Fire Department Apparatus Bay

Category

Tags

Client

Newbury Township

Project Completion Date

February 2024

Project Metrics

Volume Range: >$1M <$5M